GO-V2-006

CV Bintang Timur

Apartemen Amaris · 9 pieces · 1 sheets · yield 89.3%

Order Total
Rp 65.000.000
Due: 20/3/2026
Cutting
Edging
Drillingoptional
Notchingoptional
Washing
Temperingoptional
Laminatingoptional
QC Inspection
Packing
Completed
Current Step

Completed

Siap dispatch. On-time counter aktif.

Production Complete

Siap dispatch. Order status sudah auto-update ke COMPLETED.

Order Items (2 lines · 9 pieces)

ProductDim (mm)QtyEdgeArea (m²)Total
LM-8-TNT
LAMINATED · 8mm
1400×9504POLISHED5.76Rp 920.000
FL-5-CLR
FLOAT · 5mm
1500×10005STANDARD6.00Rp 1.800.000

Locked Nesting Layout (1 sheet)

Sheet 1
Yield: 89.3%
A1400×950A1400×950A1400×950A1400×950B1500×1000B1500×1000B1500×1000B1500×1000B1500×1000
A