Sales & Planning
  • Portal
  • Cutting Optimizer
Production & Logistics
  • Production
  • Costing & Margin
  1. Kaca
  2. Production
  3. Cmnwbmv0i00fnzotuwa7soj31
Back
GO-V2-004

Hotel Mega Bintang

Partition Ballroom · 10 pieces · 1 sheets · yield 86.8%

Order Total
Rp 55.000.000
Due: 30/3/2026
Cutting
Edging
Drillingoptional
Notchingoptional
Washing
Temperingoptional
Laminatingoptional
QC Inspection
Packing
Completed
Current Step

Tempering

Furnace 620°C + quick cool. Hanya untuk glass type TEMPERED.

Order Items (2 lines · 10 pieces)

ProductDim (mm)QtyEdgeArea (m²)Total
TP-8-CLR
TEMPERED · 8mm
1000×12507BEVELED5.76Rp 920.000
LM-8-TNT
LAMINATED · 8mm
1500×10003STANDARD6.00Rp 1.800.000

Locked Nesting Layout (1 sheet)

Sheet 1
Yield: 86.8%
A1000×1250A1000×1250A1000×1250A1000×1250A1000×1250A1000×1250A1000×1250B1500×1000B1500×1000B1500×1000
A
B